Vesgantti Twin Mattress 12 Inch – Fiberglass-Free
USD 412.49 USD
Specifications
| Item Dimensions L X W X Thickness | 75"l X 39"w X 12"th |
| Shape | Rectangle |
| Size | Twin |
| Included Components | Mattresses |
| Fill Material | Memory Foam |
| Age Range Description | Adults Kids |
| Firmness | Medium |
| Number Of Mattress Coils | 350 |
| Product Dimensions | 75"l X 39"w X 12"th |
| Top Style | Euro Top |
| Number Of Springs | 350 |
| Care Instructions | Hand Wash Only |
| Cover Material | Polyester Blend |
| Style | 12 inch |
| Room | Bedroom |
| Color | Black and White |
| Item Firmness Description | Medium |
| Item Depth | 12 Inches |
| Thickness | 12 in |
| Brand | Unbranded |
| Type | Mattress |
| Mattress Breathability | High |
| Mattress Coil Type | Pocketed Coil |
| Product Care Instructions | Hand Wash Only |
| Mattress Comfort Layer Material | Memory Foam |
| Style Name | 12 Inch |
| Set Name | Vesgantti Mattress Set |
| Item Dimensions | 75 X 39 X 12 Inches |
| Construction Type | Hybrid |
| Top-style | Euro Top |
| Item Weight | 55 lb |
Experience a revitalizing sleep with the Twin Mattress. Whether you suffer from back pain or simply wish to enhance your sleeping quality, this mattress caters to your needs. This luxurious twin mattress is thoughtfully designed to cater to your body’s needs, ensuring a restful and rejuvenating sleep experience.


Talk to a sleep expert